Processing and solarPhotovoltaic solar energy laying cable p

(1) A metal cable pipe should not have perforations, cracks, severe corrosion significantly uneven and so on, the pipe wall should be smooth and without glitches. After the cable pipe bending should not have cracks or significantly dented phenomenon, the degree of bend pipe diameter of not more than 10%, the nozzle should be made of horn or polished.
(2) The cable tube diameter of not less than 1.5 times the cable diameter, bend radius should be consistent with the provisions of penetration of cable bend radius. Each cable should not be more than three pipe elbow. Not more than two right angles.
(3) Connecting cable pipe shall meet the following requirements:
a, metal pipes should adopt large short tube socket level, short tube weld ends sealed with a threaded connection time, the connection sealed.
b, metal pipe at the socket or plug, the insertion depth of not less than 1.1 to 1.8 times the diameter, the docking surfaces should be coated with glue cement seal. When using sockets, casing welding ends should be sealed in order to ensure a secure seal.
c, thin-walled steel welded connection is strictly prohibited.
(4) When the thin-walled steel pipe for the cable should be coated with anti-corrosion paint (inside concrete buried pipe may not be painted); When using galvanized pipes, galvanized layer is peeled position should also be coated with anti-corrosion paint.
(5) Lead to the cable pipe outlet location devices should be easy device connection and without prejudice to dismantling and access. Parallel cable laying pipe mouth should be arranged in neat rows.
(6) The protective tube for the grounding wire when use of the cable, the ground wire should be welded well, then the laying of cables. There are threaded pipe joints, should be soldered jumpers.
(7) Pipe into the box (box) To straight, in box (box) within the exposed length equal to or less than 5 mm, with locking nut of the tube, the tube is exposed thread locknut 2 to 4 buckles .

Preparation and installation of cable tray:
(1) Cable tray and accessories should be properly stored and custody, should not cause deformation and damage, and should be product certification.
(2) Cable trays should be installed firmly, smooth vertical and horizontal, the vertical deviation should not be greater than the length of 2/1000, the level of error should not be larger than the width of 2/1000.
(3) Cable bridge in the live production of non-standard parts and welding, must be painted anticorrosive primer, paint should be uniform and complete color consistency.
Prev:None     Next:None
欧美韩日一级片| 月夜影视在线观看免费完整版韩剧动漫| 国产精品乱码一区二区三区| 亚洲大尺度无码无码专区| 国产亚洲色视频在线| 粉嫩小泬无遮挡久久久久久| 波多野结衣AV高清一区二区三区| 96精产国品一二三产品区别| 激情欧美成人狠狠色金八天国| 欧美精品专区免费观看| 影音先锋亚洲成AⅤ人在| 国产成人精品视频一区二区不卡| 国产精华液一线二线三线| 最新日本一区久爱精品免费| 成 人 免费 黄 色 网站无毒下载| 不卡视频一区| 一二三区理论片| 人妻中文字幕在线网站| 性欧美丰满熟妇XXXX性久久久| 国产精品丝袜黑色高跟鞋| 中国GAY片男同志免费网站| 调教玩弄奶头乳夹开乳震动器| 久久性都花花世界红灯| 国产精品伦一区二区三级视频| 毛片A级毛片免费观看品善网| 日本人妻巨大乳挤奶水| 免费人成视频在线| 免费视频在线观看网站| 少妇被粗大的猛烈进出动视频| 97人人澡人人爽91综合色| 亚洲一线产区二线产区区别在| 亚洲一线产区二线产区区别在| 欧美日韩一区二区在线观看视频| 亚洲人成无码网WWW电影麻豆| 狂暴高清在线观看免费完整版| 二人剧烈运动扑克视频| 国产欧美亚洲123区| 日韩欧美成人免费中文字幕| 欧美精品在线观看| 野花日本中文版免费观看| 神马午夜影院|